|
|
Iscritto: Dec 2011
Posts: 7
Junior Member
|
OP
Junior Member
Iscritto: Dec 2011
Posts: 7 |
...le misure passive tipo H/V...che a volte (purtroppo spesso) vengono usate per la determinazione della Vs30 Perchè purtroppo? Riporto dalle norme tecniche della Nuova Zelanda: 3.1.3.1 Hierarchy for site classification methods The preferred site classification method is from site periods based on four times the shearwave travel-time through material from the surface to underlying rock. The next preferred methods are from borelogs including measurement of geotechnical properties or by evaluation of site periods from Nakamura ratios or from recorded earthquake motions. Lacking this information, classification may be based on boreholes with descriptors but no geotechnical measurements. The least preferred method is from surface geology and estimates of the depth to underlying rock.Per gli scettici, il testo completo si scarica qui. ...e pensare che alcuni controllori delle autorizzazioni sismiche non sanno manco cosa sia l'H/V...e quando lo vedono si permettono anche di storcere il naso fino ad arrivare addirittura a sospendere la pratica per carenze della doc geologica-sismica
|
|
|
Link Copiato negli Appunti