Come sottolineato da mccoy sul forum, l'eurocodice 8, che dovrebbe entrare in vigore a breve ma che mi pare possa già essere adottato dai progettisti e dai committenti secondo DM 14/01/2008;
nella parte 5 (fondazioni) al 4 capitolo dice:
4 REQUIREMENTS FOR SITING AND FOR FOUNDATION SOILS
4.1 Siting
4.1.1 General
(1)P An assessment of the site of construction shall be carried out to determine the
nature of the supporting ground to ensure that hazards of rupture, slope instability,
liquefaction, and high densification susceptibility in the event of an earthquake are
minimised.
(2)P The possibility of these adverse phenomena occurring shall be investigated as
specified in the following subclauses.
4.1.2 Proximity to seismically active faults
(1)P Buildings of importance classes II, III, IV defined in EN 1998-1:2004, 4.2.5,
shall not be erected in the immediate vicinity of tectonic faults recognised as being
seismically active in official documents issued by competent national authorities.(2) An absence of movement in the Late Quaternary may be used to identify non
active faults for most structures that are not critical for public safety.
(3)P Special geological investigations shall be carried out for urban planning
purposes and for important structures to be erected near potentially active faults in areas
of high seismicity, in order to determine the ensuing hazard in terms of ground rupture
and the severity of ground shaking.
Quello che ci vedo di grave è che le nuove norme italiane disattendono un norma primaria e prescrittiva dell'eurocodice, cosa che non permetterebbe di affermare che le nostre nuove norme sono in accordo con l'eurocodice.
Vedete bene che anche con l'eurocodice il geologo avrebbe una ben più concreta parte nello start up dei progetti.
Ultima modifica di massimo trossero; 22/04/2009 10:38.